Scope of work performed by our team
Executing such a complex project required the involvement of specialists from various fields and coordination of activities at every stage. The work we performed included:
1.Designing the pump control system – a key element of the investment, developed according to technological standards. Our design team tailored the control system to meet the specific requirements of the technological process and ensure stable pump operation.
2.Construction of the electrical switchgear chamber – the core of the power system, which manages the energy supplied to the pumps and other installation elements. The switchgear was designed and built with strict safety standards in mind.
3.Construction of the teletechnical chamber – an integral part of the communication system, facilitating information flow between different components of the installation. The teletechnical chamber enables efficient data exchange and remote monitoring of pump operating parameters, allowing for immediate responses to changing conditions.
4.High-pressure pump power supply installation – work related to providing stable and secure power supply to the high-pressure dewatering pumps. This process required special attention to ensure optimal performance and reliability of the pumps.
5.Internal installations of the main dewatering pump chamber – the internal pump installation, responsible for continuous water drainage and maintaining the continuity of the dewatering process.
6.Powering the overflow pumps – another critical phase of the project, ensuring proper power supply for the overflow pumps, essential for the system’s functionality, efficiency, and operational continuity.
This project presented a significant challenge, both technically and organizationally. Thanks to the dedication and professionalism of our engineers and assembly team, we completed the work according to schedule, receiving positive feedback from the Client. Once again, we have demonstrated that our expertise and knowledge enable us to accomplish demanding investment projects.
The completion of this project is another step forward in the development of our company, confirming our readiness to take on ambitious challenges in the future.