Modernization of the main fan station of the

Modernization of the main fan station of the "Kościuszko" shaft in Kopalnia Soli „Wieliczka” S.A. (salt mine)

Scope of the task:
  • replacement of two axial fans,
  • modernization of the drive of ventilation dampers,
  • modernization of the switchgear of own needs of the station,
  • installation of a second, redundant control and measurement system of the station,
  • installation of the local power supply and control system for the station:
    • locally - from the ventilation station room,
    • remotely - from the mine dispatcher's panel,
  • elaboration of the complete technical and technological documentation and obtaining of all formal permits necessary to launch the station, as modernized, into operation.