Comprehensive modernization of shaft hoists in the

Comprehensive modernization of shaft hoists in the "Kinga" and "Daniłowicz" shafts of Kopalnia Soli "Wieliczka" S.A. (salt mine)

Modernization of each of the shaft hoists included:
  • replacement of the hoisting machine,
  • replacement of the shaft signaling and communication equipment,
  • replacement of the rope and directional sheaves 1-L2500,
  • replacement of the shaft doors together with locks,
  • installation of a generator set,
  • adaptation and refurbishment of buildings,
  • elaboration of technical documentations for the whole task,
  • delivery and installation of the equipment,
  • carrying out of the procedures related to approval of the equipment for use in mining operations,
  • commissioning of the supplied equipment.

Date

20 March 2013